7 Common Sewer Bypass Estimating Mistakes and How to Avoid Them
When it comes to sewer bypass projects, unexpected costs can quickly derail profitability. Before green-lighting your next project, you want to be sure you’ve covered all your bases to avert potential problems. Here are some common mistakes in sewer…
Read MoreCity of Minnetonka Pilots Acoustic Pipe Assessment Prior to Road Resurfacing
The City of Minnetonka, Minnesota is a suburb of Minneapolis/Saint Paul Metro area on the shores of Lake Minnetonka. Its water network services 2 to 2.4 billion gallons of water per year to more than 50,000 residents. The water system includes eight…
Read MoreHow LED CIPP Kept ZO&O Railroad on Track
A 75-ft run of 4-in. diameter cast iron sewer pipe at the Children’s Zoo in Lincoln, Nebraska, needed replacement due to active infiltration and intrusion (I&I). Tree roots caused such frequent clogging that a hole cut in the sheetrock of a hallway…
Read MoreLeveraging AI Technology to Assess Maintenance Holes in the Town of Ajax
With Capital Sewer Services at the helm and the sophisticated capabilities of Pioneer by SewerAI, the Town of Ajax, Ontario has set a new standard in municipal infrastructure management, reflecting their commitment to leveraging technology for enhancing…
Read MoreAzuria Water Solutions Continues to Grow with Recent Acquisitions
Azuria Water Solutions continues to expand its North American footprint with its recent acquisitions.
Read More2024 Top 50 Trenchless Engineering Firms in North America Survey Results
The annual ranking of the Top 50 Trenchless Engineering Firms.
Read MoreLast Word – New Perspectives on Cybersecurity
Cybersecurity is expensive and becoming more so every year. We need a new approach.
Read MorePlatform Partners Invests in Progressive Pipeline Management
Platform Partners LLC announced that it completed an investment in Progressive Pipeline Management LLC (PPM).
Read More2024 Trenchless Technology Project of the Year Rehabilitation Honorable Mention – South Claiborne 48-in. Water Transmission Replacement
The Sewerage & Water Board of New Orleans (SWBNO) developed a comprehensive water transmission main replacement program after years of failures to its existing pipelines to improve water quality and low pressure concerns, eliminate failures due to…
Read More2024 Trenchless Technology Project of the Year Rehabilitation Honorable Mention – Spout Run 3,300-ft. CIPP Pipe Rehab Project
Technical expertise, out of the box thinking, and teamwork turns an improbable CIPP lining project into a rousing success.
Read MoreSpecial Report: Trenchless Pipe Materials
Concrete, concrete pressure pipe, ductile iron, fiberglass-reinforced, HDPE, polymer concrete, PVC, steel, vitrified clay — these materials are all commonly chosen for today’s trenchless projects. Selecting the right pipe for your project, whether it…
Read MoreVermeer Introduces its D24 Next Generation Directional Drill
The Vermeer D24 HDD is the latest in utility installation equipment designed for urban contractors' evolving needs.
Read More2024 Trenchless Technology Project of the Year New Installation Honorable Mention – Lake Ouachita Water Supply Trenchless Crossings
The Hot Springs Water Supply Project is by far the largest water utility project in the City of Hot Spring, Arkansas’ history.
Read More2024 Trenchless Technology Project of the Year New Installation Honorable Mention – James River Crossing Sewage Force Main HDD
The James River Crossing project is part of the Hampton Roads Sanitation District’s SWIFT program.
Read MoreITpipes Receives Solution Alignment Award at Esri Infrastructure Management and GIS Conference
ITpipes' received the Solution Alignment award from Esri.
Read MoreNASSCO Report – Delivering the Best Workplace Safety Training
This article will cover some basic concepts that can boost your safety training program.
Read More2024 Trenchless Technology Project of the Year Rehabilitation Runner Up – Moonlight Beach Triple 72-in. CMP UV-CIPP Rehabilitation Project
As part of its annual storm drain management program the City of Encinitas, California, identified a trio of pipes at Moonlight State Beach that were in need of repair.
Read More2024 Trenchless Technology Project of the Year New Installation Runner Up – First Creek Interceptor
Aurora Water’s First Creek Interceptor project was selected as the 2024 Trenchless Technology New Installation project of the Year Runner-up. The First Creek Interceptor ensures a reliable, sustainable and efficient wastewater conveyance system for…
Read MoreAzuria Acquires Portion of Miller Pipeline’s Municipal Services Division
Azuria Water Solutions continues its expansion with the acquisition of a portion of Miller Pipeline's municipal services division.
Read More
